Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Status report on JAERI-AVF cyclotron system

Nakamura, Yoshiteru; Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Fukuda, Mitsuhiro; Okumura, Susumu; Yokota, Wataru; Yoshida, Kenichi; Miyawaki, Nobumasa; et al.

Proceedings of 17th International Conference on Cyclotrons and Their Applications (CYCLOTRONS 2004), p.157 - 159, 2005/00

The AVF cyclotron system at JAERI Takasaki has been smoothly operated for 13 years since 1991. This system continues to deliver various ion species with very frequent alterations of operational conditions. In order to provide a heavy ion beam with energy spread of 0.02 % required for microbeam production, we have developed a flat-top acceleration system, an additional buncher driven by saw-tooth wave, and improved the central region of the cyclotron. An old gradient corrector of passive type was replaced by a new gradient corrector with an active coil inside to obtain complete matching between the trunk beam line and extraction trajectory from the cyclotron. A compact ion source with a set of movable permanent magnet was designed to produce mainly light ions, which will be replaced the existing multi-cusp ion source in future.

Journal Articles

Status report on the JAERI AVF cyclotron system

Nakamura, Yoshiteru; Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Tamura, Hiroyuki; Kurashima, Satoshi; Yokota, Wataru; Okumura, Susumu; Fukuda, Mitsuhiro; Arakawa, Kazuo

AIP Conference Proceedings 600, p.129 - 132, 2001/00

The AVF cyclotron system at JAERI Takasaki has been smoothly operated without serious troubles since the first beam extraction of 50 MeV 4He2+ in March 1991. A yearly operation time is about 3200 hours on an average for past several years. In last three years, we performed some improvements and developments as followings: stabilization of the cyclotron beam, renewal of the control computers and basic programs, installation of a new ECR ion source and reconstruction of the rotary shutter. Furthermore, cocktail beams of series M/Q=4 and M/Q=2 have been developed continuously. Now we are modifying the RF cavity for the flat-top acceleration by the addition of 5th harmonic frequency.

2 (Records 1-2 displayed on this page)
  • 1